Solution path

Cathodic protection for oil & gas pipelines

Cathodic protection materials, impressed-current options, monitoring products and project support for buried oil and gas pipelines.

Cathodic protection for oil & gas pipelines
Cathodic protection for oil & gas pipelines
Oil & gas pipelinesSolution path

Buried oil and gas pipelines and associated metallic assets

Soil, crossings, stations and existing coating conditions

Pipeline and protected structures
Soil and surrounding conditions
Existing design and drawings
Project stage and construction conditions
Protection focus

What the project conversation should keep visible

The following focus points connect the protected object and the operating environment with a practical technical route.

01

Continuous protection along long pipelines

02

Stations, crossings and casing interfaces

03

Potential testing and operational checks

Technical routes

Possible route directions

  • Sacrificial-anode protection
  • Impressed-current cathodic protection
  • Test-post and reference-electrode monitoring
  • Connection and installation accessories
Service scope

What can be discussed

  • Cathodic protection material supply
  • System discussion and material configuration
  • Field installation and construction support
Product directions

Connect the asset to the product system

Use the product family links as a starting point, then carry the protected asset and installation conditions into inquiry.

Project outputs

Information to prepare

Relevant product directions
System composition considerations
Supply, design and construction scope
Project information to prepare
Related paths

Continue with a nearby application direction

Solution FAQ

Questions about this path

Which pipeline sections should be described first?

Start with the buried line, stations, crossings, casings and associated metallic structures, then add existing coating and site conditions.

How is the protection route selected?

Sacrificial-anode and impressed-current routes are different technical paths. The protected range, environment, design and construction conditions should be reviewed together.

What if the pipeline design is incomplete?

Share the asset, soil conditions, known quantities and any available drawings. The product and system discussion can begin with the information already available.